Project Description

Status

80% Complete

Project Start

2024

Address

Osh city

Capacity

≈ 770,000 m³

open widget
Close

New Sanitary Landfill, Osh

A Modern Facility for the Safe, Controlled Disposal of Municipal Solid Waste

The project develops Osh’s solid waste management infrastructure, encompassing construction of a new sanitary landfill along with the closure and rehabilitation of the existing dumpsite.

 

Empowering public health

A Comprehensive Solution for the City

New Sanitary Landfill
The primary facility for final waste disposal.

Existing Landfill
Closed and undergoing rehabilitation.

Engineering Systems
Leachate management, gas venting, surface water drainage, roads, utility networks, and other supporting infrastructure.

Empowering public health

Location and Access

The new sanitary landfill is located in Osh, in a natural valley between two hills. Primary access to the site runs from the south, off the paved Osh–Nookat road, with an internal road network serving on-site movement.

Key Facilities and Systems

New Sanitary Landfill — Modern Infrastructure for Controlled Waste Disposal

The new sanitary landfill includes Phase 1 working cells, a receiving area, a weighbridge complex, administrative and technical buildings, internal roads, and a full set of engineering systems.

Key Design Elements:

Cells 1A / 1B
Phase 1 is designed for a capacity of approximately 770,000 m³.

Base Liner System
GCL, HDPE membrane, protective geotextile, and a drainage layer.

Leachate Management System
Collection, conveyance, storage, and subsequent treatment of leachate.

Reception Infrastructure
Weighbridge complex, entry control, and waste reception.

Environmental Protection

The base of each working cell is built as a multi-layer barrier system, preventing the migration of contaminants into the ground and enabling organized leachate collection.

HDPE membrane · GCL · geotextile · drainage system

Closure and Rehabilitation of the Old Landfill

Located on the southwestern outskirts of Osh at the foot of the Alai Range, the existing landfill is being decommissioned and undergoing comprehensive rehabilitation. Work is focused on shaping a stable landfill profile, containing the waste mass, and establishing environmental protection systems.

Key Works

  • Formation of the final landfill profile
  • Waste relocation and compaction
  • Construction of a perimeter embankment
  • Installation of the final cover system
  • Surface water drainage system
  • Passive gas venting

Approximately 80% complete — closure and rehabilitation of the old landfill are in their final stage.

Final Cover System

The final cover is built up from a vegetative topsoil layer, protective geotextile, a grading layer, and a drainage/protection layer — shielding the landfill body from weather exposure and enabling organized surface water runoff.

Project Scale

168,000 m² — protective geotextile
84,000 m² — vegetative topsoil layer